This website stores cookies on your computer. These cookies are used to collect information about how you interact with our website and allow us to remember you. We use this information in order to improve and customize your browsing experience and for analytics and metrics about our visitors both on this website and other media.By proceeding, you agree and confirm your consent.
Deliver To
- Home
- Installation Details Page
Installation
Installation Terms & Conditions
A. Standard Installation kit would contain-
With Outdoor Unit
Detail | Quantity |
---|---|
3m copper piping ( liquid + suction pipe) with insulation | 1 |
3.7 m interconnect cable ( communication cable) | 1 |
Tie wraps for tying liquid and suction line together |
With Indoor Unit
Detail | Quantity |
---|---|
Remote handset | 1 |
Indoor unit mounting plate | 1 |
Installation/operation manual | 1 |
Warranty card | 1 |
Screws for fixing mounting plate | 1 |
B. Scope of work for Standard Installation (Hi-wall residential split air-conditioner up to 2.02 Tr )is limited to
- Mounting and installation of indoor unit on wall
- Placing the outdoor unit at serviceable location
- Drilling one hole on a brick wall (no core cutting) to connect the Outdoor unit (ODU) with the Indoor unit (IDU)
- Laying of interconnect copper pipe between indoor and outdoor unit (if provided with the unit) . Vacuumising the piping along with indoor unit. Approved copper makes to be used
- Laying of drain pipe for water and connecting with indoor unit.
- Connecting ODU and IDU using standard wire length provided by the company and commissioning of the unit.
- Sealing the holes with white cement / POP
- Connecting ac stabilizer if provided by the customer in-between the main power point and the outdoor unit.
- Fixing ODU stand if available
- Checking the machine performance
- Demo of the product
C. Below civil work, but not limited to, would not be included in standard installation scope of work:
- Drilling more than one hole for copper pipe connectivity between IDU and ODU
- Thicker concrete wall needs specialized equipment, so drilling holes through them will incur additional cost (core cutting). No wall chiseling / civil or mason work is included
- An additional voltage stabilizer, if there are voltage fluctuations in the area
- Wiring extension from Electricity Meter to Installation site, Power point/MCB fitting and any other Electrical work will be organized by the customer from their side.
- Any extra copper pipe length that might be needed for installation (as per customerâs site requirement) beyond the copper pipe supplied with the product and the labour charges for laying this additional copper pipe cost will be borne by customer.
- Grill/glass cutting and welding work will be organized by customer from their side.
- Uninstallation/Shifting of old AC
- Outdoor stand if supplied by customer, labour charges for fixing same has to be borne by customer.
- Ladder to be arranged by customer in case required at installation site.
- In case piping is already pre-laid by customer during construction stage, then nitrogen pressure testing will be required after connecting outdoor and indoor. The cost of the same to be borne by customer.
- Anything else not covered in standard installation will be chargeable.
D. Applicable additional charges during installation for Hi-wall residential split air-conditioner or window air-conditioner customer:
Installation Charges applicable for Hi-wall Residential split air-conditioner / Window air-conditioner Customer
Sr. No | Installation Items | Unit | Window | SAC |
---|---|---|---|---|
1 | Site inspection Charges * | Per Unit | 350 | 350 |
2 | Installation Charges (Standard) | Per Unit | 500 | 1500 |
3 | Dismantling | Per Unit | 500 | 1000 |
4 | Dismantling | Per Mtr | 500 | 1000 |
5 |
Extra Copper Piping** (beyond the available in Kit) with insulation. 1/4 inch 1/2 inch ,3/8 inch , 5/8 inch |
Per Mtr | NA |
300 400 |
6 | 3 Core Wire ( Main power supply) | Per Mtr | NA | 100 |
7 | Drain pipe ( 0.75" insulated wire mesh pipe) | Per Mtr | NA | 100 |
8 | Standard Wall mount Stand | Per Unit | NA | 750 |
9 | Labour charges for fixing wall mounting stand if supplied by customer | Per Unit | 250 | 250 |
10 | Labour charges for fixing copper pipes** with insulation, drain pipe, electrical cable if supplied by customer | Per Mtr | NA | 150 |
11 | N2 Pressure Testing for already installed copper pipes | Lumsum | NA | 500 |
Installation Terms & Conditions
- No Electrical work included in any sort of installation
- No Wall chiseling / Civil or mason work is included in any sort of installation.
- It should be on actual chargeable basis to customer.
- GST applicable as per the government norms.
- If anything additional required which is not covered above would be on actual chargeable basis.
- *In case customer is getting installation done post site inspection, charges for same will be adjusted against total installation cost
- ** Approved copper makes to be used & standard ISI cable to be used.
- Ladder to be arranged by customer in case required at installation site.